Transition: Two system verification test cycles and one final regression cycle, labeled as TSVT1, TSVT2, and TSVTR
产品化:两个系统验证测试周期以及一个最终回归周期,被标注为:TSVT1、 TSVT2 和 TSVTR。
The function verification of integrated circuits has become the bottleneck of the design cycle because of the increasing scale and the complexity of chips.
集成电路芯片的规模不断增大,功能越来越复杂,设计验证工作量也越来越大,成为整个设计周期的“瓶颈”。
Study participants ranked verification of insurance, demographic information and outstanding balances as most important to improving revenue cycle management.
参与研究的排名核查保险,人口信息和未清余额为最重要的是要提高收入周期管理。
应用推荐